How to Import Fresh Peppers from Spain to the UK: The Controls, Documents and Checks, Step by Step
Step-by-step guide to importing fresh peppers from Spain to the UK — BTOM risk category, IPAFFS, phytosanitary certificate, CHED-PP and the checks at the GB border.

How to Import Fresh Peppers from Spain to the UK: The Controls, Documents and Checks, Step by Step
Fresh peppers from Spain are regulated plant produce. They need an IPAFFS pre-notification and a phytosanitary certificate — not an EHC.
That one distinction trips up more importers than any other. If you're new to importing fresh peppers to the UK, the instinct is to treat them like any other EU grocery line and assume they move freely. They don't. Fresh peppers are plants for planting's near neighbour — fresh plant produce — and that puts them inside the GB plant-health regime. This piece walks the whole route, end to end: the commodity code, the Border Target Operating Model (BTOM) risk category, the IPAFFS pre-notification, the phytosanitary certificate issued by the Spanish national plant protection organisation (NPPO), the CHED-PP, the role of APHA, and where a consignment gets held at the GB border. By the end you'll know exactly which document does what, who raises it, and when.
Rules change, and your specific variety or supplier can shift the picture. Treat this as practical guidance, not regulated advice — and check the current position for your commodity before you ship.
Are fresh peppers from Spain controlled goods at the GB border?
Yes. Fresh peppers are regulated plant produce, so importing them into Great Britain triggers plant-health (phytosanitary) controls under the Border Target Operating Model. They are not products of animal origin (POAO), so they need a phytosanitary certificate and an IPAFFS pre-notification — not an Export Health Certificate (EHC). That single classification decides everything downstream.
The confusion is understandable. The food-import controls people hear most about — CHED-P, EHCs, port-health holds — apply to POAO: meat, dairy, fish, eggs and products made from them. Peppers are not animal product, so the animal-health route doesn't apply. Instead they sit under the phytosanitary (plant-health) regime, administered for England, Scotland and Wales by the Animal and Plant Health Agency (APHA). Get this right at the start and the rest of the process falls into a logical order. Get it wrong — book an EHC, or assume there's no certificate at all — and you've either wasted effort or stranded a perishable load.
So before anything else: fresh peppers are plant produce, the controlling system is plant health, and the documents are an IPAFFS pre-notification plus a phytosanitary certificate, sometimes shortened informally to PNAO-style language when people talk about "produce, not animal origin" import rules. Whatever the shorthand, the regime is plant health.
What commodity code applies to fresh peppers, and why does it matter?
Fresh sweet (bell) peppers fall under commodity heading 0709, with the specific code depending on the variety and whether they are sweet or chilli-type peppers. The commodity code matters because it drives the duty treatment, determines whether plant-health controls apply, and — crucially — feeds the BTOM risk category that decides what checks your consignment faces.
The commodity code is the spine of the whole import. You declare it on your customs entry in the Customs Declaration Service (CDS), and it's the same code that anchors the IPAFFS notification. If the code on your customs declaration and the code on your plant-health pre-notification don't agree, you've planted a documentary mismatch — and a mismatch is one of the most common reasons a consignment is queried at the border.
A worked point: classifying peppers and tomatoes feels interchangeable to a packhouse, but they're different commodities with potentially different risk treatment under the plant-health rules. Don't carry a classification across produce lines by assumption. Confirm the code for the exact pepper you're importing using the GOV.UK Trade Tariff tool, and confirm whether that code is one Defra has flagged as requiring plant-health controls. If you're unsure which code is correct, that's a question worth resolving before you raise a single document — because everything downstream inherits it.
What risk category does BTOM put Spanish peppers in?
Under the Border Target Operating Model, Defra assigns plant produce a risk category — low, medium or high — and that category sets the level of checks. Fresh peppers are generally treated as medium-risk regulated plant produce, which means they require a phytosanitary certificate and an IPAFFS pre-notification and may be selected for documentary, identity or physical checks at a control point.
The Border Target Operating Model (BTOM) is the framework that replaced the earlier, looser arrangements for EU goods. It sorts plant and animal imports into risk categories and attaches a proportionate level of control to each. For plant produce the practical question is which of three buckets your commodity sits in:
- Low-risk produce: pre-notification may be required, but typically no phytosanitary certificate and minimal routine checks.
- Medium-risk produce: requires a phytosanitary certificate and an IPAFFS pre-notification, and is liable to be called for checks.
- High-risk produce: the full set of controls, with the highest likelihood of physical inspection.
Fresh peppers fall on the controlled side of that line. The exact category for your consignment is published by Defra and can change, so verify it against the current GOV.UK plant-health import guidance rather than relying on where peppers sat last season. This is the genuine regulatory-transition trap: a classification you set before BTOM came in may now route your peppers differently than you expect.
One honest caveat on checks: being in a category that's liable to inspection does not mean every consignment is physically opened. Only a proportion of plant consignments are selected for an identity or physical check; the rest clear on documents. But you must be ready for selection on any given load — you don't get to choose, and the call can come after the goods have arrived.
Which documents do you actually need to import fresh peppers from Spain?
To import fresh peppers from Spain to the UK you need: a phytosanitary certificate issued by the Spanish NPPO before the goods leave, an IPAFFS pre-notification raised before arrival that generates a CHED-PP, a customs declaration in CDS with the correct commodity code, and standard commercial paperwork — invoice, packing list and transport documents. Each does a distinct job.
Here's what each route actually needs, in plain terms:
- Phytosanitary certificate. The official plant-health document confirming the consignment has been inspected by the exporting country's plant protection authority and meets GB import requirements. For Spanish peppers, this is issued by the Spanish NPPO (the plant-health authority in Spain) — and it must be issued before the consignment leaves. You cannot backfill it once the lorry is rolling.
- IPAFFS pre-notification. IPAFFS (Import of Products, Animals, Food and Feed System) is the GB online system you use to tell the authorities a regulated consignment is coming. For plant produce, submitting the notification generates a CHED-PP — the Common Health Entry Document for Plants and Plant Products. This must be raised before the goods arrive at the GB border.
- CHED-PP. Not a separate form you fill in by hand — it's the output of your IPAFFS notification. The "PP" matters: peppers get a CHED-PP (plants), not a CHED-P (products of animal origin) or a CHED-D (high-risk food and feed of non-animal origin). Naming the wrong type is a classic mix-up that signals to the border that something hasn't been understood.
- Customs declaration (CDS). Your import declaration into the Customs Declaration Service, carrying the commodity code, customs value and origin. Note that EU origin does not automatically mean zero duty — preferential rates depend on the goods meeting rules of origin, which for Spanish-grown peppers they generally will, but the claim still has to be made correctly.
- Commercial documents. Invoice, packing list, transport/CMR documents. Mundane, but the identity check compares these against the CHED-PP and the phytosanitary certificate — so consistency across all of them matters.
If the commodity code, the description, the quantities and the consignor/consignee details line up across the phytosanitary certificate, the IPAFFS notification and the customs entry, you've removed most of the friction before the goods move.
Who raises each document — you, your supplier, or your freight forwarder?
Responsibility splits across the chain, and the gaps between parties are where consignments break. The Spanish exporter arranges the phytosanitary certificate through their NPPO. The GB importer (or their agent) is responsible for the IPAFFS pre-notification and the customs declaration. Your freight forwarder may book the movement and lodge entries, but accountability for the right documents existing sits with you.
This is the part importers most often get wrong by omission. "The forwarder handles it" is true for the mechanics of lodging a declaration — but it is your job to know that the consignment needs a CHED-PP, that the IPAFFS notification must be raised before arrival, and that the phytosanitary certificate has to be issued in Spain first. A forwarder books what you tell them to book.
Walk it backwards as a diagnostic. Peppers at the GB border → CHED-PP raised in IPAFFS → phytosanitary certificate issued by the Spanish NPPO before departure → commodity code agreed across all documents. If you can't confidently say where each of those sits and who owns it, that's where your consignment will break.
A worked example: a chilled load of peppers, packhouse to GB shelf
Take a single refrigerated load of fresh peppers leaving a packhouse near Almería, bound for a GB distribution centre. Here's the sequence run end to end, so you can see where the control points sit.
1. Before loading (Spain). The classification is confirmed — these are fresh sweet peppers under heading 0709, a medium-risk regulated plant. The Spanish exporter arranges inspection by their NPPO and obtains the phytosanitary certificate. This happens before the goods leave; it certifies the consignment as inspected and compliant at origin.
2. Before arrival (GB importer). You — or your agent on your instruction — raise the IPAFFS pre-notification, referencing the phytosanitary certificate and the agreed commodity code. IPAFFS generates the CHED-PP. You also prepare the CDS customs declaration. The notification window matters: raise it too late and the goods arrive without clearance pending, and the hold happens before anyone has even looked at a document.
3. In transit. The load moves under the relevant goods-vehicle movement arrangements. Your documents — phytosanitary certificate, CHED-PP reference, invoice, packing list — travel as a consistent set.
4. At the GB border. The consignment is assessed against the CHED-PP. Most loads clear on a documentary check. A proportion are selected for an identity check (do the goods match the paperwork?) or a physical check (an inspection at a control point). With a chilled, perishable load, this is where time bites: a documentary query — a missing certificate, a mismatched code, the wrong CHED type — compounds in cost by the hour while the goods sit.
5. Release. Once checks are satisfied and the customs entry is cleared, the goods are released to onward delivery — packhouse to GB shelf.
The lesson from running it this way: the failure points cluster at steps 1 and 2, in Spain and before arrival — not at the border itself. By the time a hold notice lands, the missing piece was usually something that should have been sorted days earlier and a few hundred miles away.
What happens if a consignment of peppers is held?
A hold means the border has a query it needs resolved before release — most often a missing or invalid phytosanitary certificate, a commodity-code or description mismatch between documents, the wrong CHED type, or an IPAFFS notification raised too late. The notice rarely says which. With perishables, resolving it quickly is everything, because the cost of a chilled hold mounts by the hour.
The opaque part is real: a hold notice often says little more than "awaiting documentary check." It rarely tells you which document is the problem. In practice, for fresh peppers the usual suspects are a phytosanitary certificate that wasn't issued before departure, a code that doesn't match across the CHED-PP and the CDS entry, or a notification submitted too late to be cleared before arrival. The fix depends on the cause — and some causes (a certificate that should have been issued in Spain and wasn't) can't be fully remedied at the border at all.
This is exactly the moment to get expert eyes on it fast rather than trading emails with a port while a chilled load warms up.
How does this interact with labelling and onward sale?
Plant-health clearance gets the peppers across the border; it doesn't make them ready for retail sale. Fresh produce still has to meet GB marketing standards and labelling rules — country of origin, class, variety and, where they apply, the relevant produce marketing standards — before it reaches a shelf. Clearing customs and clearing the shelf are two different bars.
It's worth flagging because importers sometimes treat the border as the finish line. It isn't. The same consignment that cleared its CHED-PP still needs to satisfy the rules that govern how fresh produce is presented and sold in GB. If you're importing peppers to put under your own brand or into a retail listing, build the marketing-standards and labelling check in alongside the customs and plant-health work — not after the goods have landed.
Bringing it together
Importing fresh peppers from Spain to the UK is entirely manageable once you see the shape of it: classify the goods correctly, confirm the BTOM risk category, get the phytosanitary certificate issued in Spain before departure, raise the IPAFFS pre-notification (which generates your CHED-PP) before arrival, and keep the commodity code consistent across every document. Do that, and most loads clear on documents. The holds happen when one of those steps is missed or out of sequence — and with perishables, sequence is everything.
Borders are complicated. We aren't. Tell us the goods and the route — we'll tell you exactly what you need.
Something held, or moving soon? The Falsum Helpdesk triages live customs and SPS issues — support.falsum.co.uk. If you're planning the route rather than fighting a hold, talk to us and we'll walk your specific consignment through before it ships.
Sam Ballard-Robinson is the founder and lead customs adviser at Falsum, a specialist advisory for food and drink trading across borders.
FAQ
No. An Export Health Certificate (EHC) is for products of animal origin (POAO). Fresh peppers are regulated plant produce, so they need a phytosanitary certificate issued by the Spanish NPPO and an IPAFFS pre-notification instead — not an EHC. Getting this distinction right is the first step.
A CHED-PP is the Common Health Entry Document for Plants and Plant Products — generated when you raise an IPAFFS pre-notification for plant produce like peppers. A CHED-P covers products of animal origin. Peppers always take a CHED-PP, never a CHED-P; naming the wrong type causes border queries.
Before the consignment leaves Spain. The phytosanitary certificate is issued by the Spanish national plant protection organisation (NPPO) at origin, certifying the goods were inspected and meet GB requirements. You cannot backfill it once the lorry is rolling — a missing certificate can strand a perishable load.
No. Fresh peppers are generally treated as medium-risk under the Border Target Operating Model, meaning they're liable for checks but only a proportion are physically inspected. Most clear on a documentary check. You can't choose, though, so every load must be document-ready in case it's selected.
The GB importer, or an agent acting on the importer's instruction. Your freight forwarder may lodge entries, but accountability for the IPAFFS pre-notification and a correct CHED-PP sits with you. The Spanish exporter arranges the phytosanitary certificate at their end. Knowing who owns each document prevents the gaps that cause holds.
A question about your goods specifically?
Tell us the product and the route — we'll tell you exactly what you need.