How to Import Green Coffee Into the UK From Vietnam: The Controls, Documents and Checks, Step by Step
How to import green coffee from Vietnam to the UK — commodity code, phytosanitary certificate, BTOM risk category, IPAFFS pre-notification, CDS declaration and duty, step by step.

How to Import Green Coffee Into the UK From Vietnam: The Controls, Documents and Checks, Step by Step
Green coffee beans are unroasted seeds — a plant product. That single fact decides which UK import controls you face from Vietnam.
This is the most common thing first-time coffee importers get wrong. Roasted coffee and green coffee feel like the same product with a processing step in between. For your customs declaration and your plant-health obligations, they're not. Green coffee — Coffea seeds, dried but not roasted — sits in chapter 09 of the UK tariff and is treated as a regulated plant product, which means it carries phytosanitary exposure that roasted coffee does not. To import it from Vietnam, you'll work through four real systems: the commodity code that classifies it, HMRC's Customs Declaration Service (CDS) where the import declaration is filed, the Border Target Operating Model (BTOM) that sorts plant products into risk categories, and — depending on that category — a phytosanitary certificate (PC) issued at origin and pre-notification on IPAFFS. Here's how those fit together, in the order you actually hit them.
A note before we start: rules on plant-product imports change as BTOM phases in. Everything below is the framework and where to verify each step — but check the current rules for green coffee from Vietnam against GOV.UK, or ask us, before you book a container. This is practical guidance, not a substitute for confirming your specific commodity and route.
Is green coffee treated as a plant product when imported to GB?
Yes. Green coffee is unroasted Coffea seed — a plant product, not a product of animal origin (POAO). That classification is what brings it under the UK's plant-health (phytosanitary) regime, administered by Defra and APHA, rather than the animal-health (SPS/POAO) controls that govern things like meat or dairy. It's the first fact that shapes everything else.
This matters because the two regimes run on different paperwork and different border systems. POAO imports revolve around Export Health Certificates and CHED-P pre-notification. Plant products revolve around phytosanitary certificates issued by the exporting country's plant-protection organisation and, where required, pre-notification on IPAFFS with a CHED-PP. If you've imported a food product before that wasn't a plant — or if your forwarder mostly handles POAO — don't assume the process carries across. Confirm green coffee's plant-health status and the controls that attach to it as your starting point, not your last check.
What commodity code applies to green coffee from Vietnam?
Green (unroasted) coffee is classified under commodity code heading 0901 of the UK Integrated Online Tariff, with the full code distinguishing decaffeinated from non-decaffeinated and roasted from unroasted. The exact 10-digit code you declare on CDS sets two things at once: the duty rate and the import controls that apply.
This is why classification isn't only a cost question. Operators tend to think of the commodity code as "the thing that decides duty," and it does — but it also pulls in the regulatory measures attached to that code. A wrong code on green coffee can put your consignment under the wrong controls entirely, or miss a control you needed. Use the GOV.UK Trade Tariff tool to confirm the live code for your exact product (decaffeinated or not, and any further processing), and check the measures listed against it. If your supplier or forwarder hands you a code, verify it yourself against the tariff — you, the importer, are responsible for the declaration's accuracy, not them.
Does green coffee from Vietnam need a phytosanitary certificate?
Whether green coffee requires a phytosanitary certificate (PC) depends on its BTOM risk category — and you must check the current category for this commodity, because BTOM has been phasing in and categories can change. The PC, if required, is issued by the exporting country's plant-protection organisation in Vietnam, before the goods ship, and certifies the consignment meets GB plant-health requirements.
This is the single most expensive sequencing error in this trade lane. A phytosanitary certificate is an origin-issued document: it's arranged in Vietnam by your exporter through their national plant-protection organisation. If you discover at the GB border that you needed one and don't have it, you can't simply produce it after the fact — the consignment moves without it, or it's held. So the question "does my green coffee need a PC?" is a pre-shipment decision, not a port one. Resolve it before the container books. GOV.UK publishes the import requirements for plant products entering GB and the BTOM risk categorisation; that's where to confirm whether your specific coffee, from Vietnam, currently sits in a category that requires a PC.
Do I need to pre-notify green coffee on IPAFFS?
If your green coffee falls into a BTOM risk category that requires it, you'll pre-notify the consignment on IPAFFS (the Import of Products, Animals, Food and Feed System) before it arrives, generating a CHED-PP (Common Health Entry Document for plants and plant products). Lower-risk plant products may not require pre-notification — which is why the risk category is the deciding fact.
IPAFFS is the GB system where importers (or their agent) raise the pre-notification that tells the authorities a regulated consignment is coming. For plant products, the document type is the CHED-PP. The pre-notification has to be in place ahead of arrival — like the phytosanitary certificate, it's not something you backfill once the container has landed. If your coffee's category requires IPAFFS pre-notification, build that into your pre-arrival checklist alongside the customs declaration. If it doesn't, you don't need to raise one — and a good adviser will tell you that rather than create work that isn't required. That's the "advisory, not a black box" principle: you should know what you don't need as clearly as what you do.
What customs declaration do I file, and where?
You file an import declaration on HMRC's Customs Declaration Service (CDS) — the GB system that replaced CHIEF for customs declarations. The declaration states the commodity code, the customs value, the country of origin (Vietnam), and the duty due, and it's where any plant-health control references (your CHED-PP, where required) are linked to the consignment.
In practice, most importers file CDS declarations through a customs agent or freight forwarder rather than directly, but the responsibility for the declaration being correct sits with you as the importer of record. The declaration draws on your commercial invoice (value, parties, terms), the commodity code you've confirmed, and the origin. Get the value and Incoterms right on the invoice: they drive the customs value, which drives the duty. And make sure whoever files the declaration has the plant-health references they need — a customs declaration and a plant-health pre-notification are two separate workstreams that have to meet at the border.
What duty will I pay on Vietnamese green coffee?
The duty depends on the commodity code and the origin. Vietnam is outside the EU, so EU-GB arrangements don't apply; instead, check whether the UK-Vietnam free trade agreement offers a preferential rate, and whether your consignment meets that agreement's rules of origin to claim it. Without a valid origin claim, the standard (MFN) tariff for the code applies.
This is where "Vietnam isn't in the EU, so it's all duty anyway" trips people up. The UK has a trade agreement with Vietnam, and green coffee may qualify for a preferential duty rate under it — but only if the goods meet the agreement's rules of origin and you hold the right origin evidence to support the claim on your CDS declaration. Don't assume the preference applies automatically; equally, don't assume you're stuck with the full rate. Confirm the current preferential and standard rates for your exact commodity code on the GOV.UK Trade Tariff, and check what origin documentation your supplier needs to provide. Duty and the plant-health checks are two separate problems — solving one doesn't solve the other.
A worked example: one container of green coffee, Ho Chi Minh City to a GB port
Let's run a single consignment through end to end, so the sequence is concrete.
Step 1 — Classify (before you contract). You confirm the commodity code under heading 0901 on the GOV.UK Trade Tariff for your exact product — say, non-decaffeinated, unroasted green coffee. You note the measures listed against the code: the duty rate, any preference under the UK-Vietnam FTA, and the plant-health controls.
Step 2 — Check the controls (before you ship). Using GOV.UK's plant-product import requirements, you confirm green coffee's current BTOM risk category and what it triggers: whether a phytosanitary certificate is required, and whether IPAFFS pre-notification (a CHED-PP) is needed. This is your pre-shipment decision. If a PC is required, you tell your Vietnamese exporter now, because they arrange it through their plant-protection organisation before loading.
Step 3 — Sort the commercial documents. You agree Incoterms and get a clean commercial invoice showing value, parties, and terms, plus the packing list and bill of lading / airway bill. You confirm what origin evidence the exporter will provide if you're claiming the UK-Vietnam preferential rate.
Step 4 — Pre-notify (before arrival). If the risk category requires it, you (or your agent) raise the IPAFFS pre-notification, generating the CHED-PP, ahead of the consignment landing. You keep the reference to link to the customs declaration.
Step 5 — Declare on CDS (at import). Your customs agent files the import declaration on CDS, stating the commodity code, value, origin, duty (with or without preference), and linking any plant-health references. Duty is accounted for.
Step 6 — Border and release. The consignment arrives. If documentary or physical plant-health checks apply for its risk category, they happen; if all is in order, the goods are released. Because the PC was arranged at origin and the pre-notification was raised before arrival, there's nothing missing to hold it.
The point of running it backwards from the order: every document that has to be issued at origin (the PC) or raised before arrival (the CHED-PP) is a constraint on your shipping window, not a port formality. Sort the controls before the container books.
What documents does each route actually need?
It's worth being precise about what's on the list, because the list changes with the risk category. Across most green-coffee-from-Vietnam imports you'll touch:
- Commercial invoice — value, parties, Incoterms. Drives the customs value and duty.
- Packing list — quantities, weights, packaging.
- Bill of lading or airway bill — the transport document.
- Commodity code — confirmed on the GOV.UK Trade Tariff (heading 0901).
- Origin evidence — only if you're claiming the UK-Vietnam preferential duty rate; check what the FTA requires.
- Phytosanitary certificate — if the BTOM risk category requires it; issued in Vietnam before shipping.
- IPAFFS pre-notification / CHED-PP — if the risk category requires it; raised before arrival.
- CDS import declaration — always; filed at import by you or your agent.
The two conditional items — the PC and the CHED-PP — are the ones that depend on the live risk category and the ones that cause holds when missed. Everything else is standard import documentation you'd produce for most goods.
How does this interact with the rest of the import?
Three adjacent mechanisms shape the job. First, the commodity code isn't just a duty lookup — it carries the controls, so getting it right is what surfaces the plant-health measures in the first place. Second, rules of origin under the UK-Vietnam agreement decide whether your duty is preferential, which is a value question that lives on the invoice and the origin evidence, separate from the plant-health pathway. Third, if you go on to roast and sell the coffee, you step into labelling (FIC food information rules) for the finished retail product — a different regime again, downstream of import. Import controls get the green beans across the border; labelling governs what you put on the bag afterwards.
Keeping these separate in your head is half the battle. Duty is a CDS-and-origin problem. Plant health is a BTOM-PC-IPAFFS problem. Labelling is a downstream FIC problem. They meet on one consignment but they're solved on different desks.
Getting it moving
Importing green coffee from Vietnam isn't exotic, but it isn't frictionless either — it's a regulated plant product, and the controls that attach to it sit on a BTOM risk category that's worth confirming for every order rather than assuming from last time. Classify it correctly, confirm whether you need a phytosanitary certificate and IPAFFS pre-notification before the container books, get the origin question right if you want the preferential duty rate, and file a clean CDS declaration. Borders are complicated. We aren't.
If you've got coffee moving soon, or something held at a GB port right now, the Falsum Helpdesk triages live customs and SPS issues — support.falsum.co.uk. And if you're planning a first import and want the pathway confirmed before you commit to a shipment: tell us the goods and the route — we'll tell you exactly what you need.
FAQ
Yes. Green coffee is unroasted Coffea seed — a plant product, not a product of animal origin. That brings it under the UK's plant-health (phytosanitary) regime run by Defra and APHA, with different paperwork and border systems from POAO imports like meat or dairy.
It depends on the commodity's current BTOM risk category, which you must check on GOV.UK as categories change. If required, the phytosanitary certificate is issued by Vietnam's plant-protection organisation before shipping — it's a pre-shipment decision, not something you can produce at the GB border.
Green (unroasted) coffee is classified under heading 0901 of the UK Integrated Online Tariff, with the full code distinguishing decaffeinated from non-decaffeinated. Confirm the exact 10-digit code on the GOV.UK Trade Tariff, because it sets both the duty rate and the import controls that apply.
Duty depends on the commodity code and origin. Vietnam is outside the EU, but the UK-Vietnam free trade agreement may offer a preferential rate if your consignment meets its rules of origin and you hold the right evidence. Otherwise the standard tariff applies — check current rates on GOV.UK.
On HMRC's Customs Declaration Service (CDS), usually through a customs agent or freight forwarder. The declaration states the commodity code, customs value, origin and duty, and links any plant-health references like a CHED-PP. Responsibility for the declaration's accuracy sits with you as the importer of record.
A question about your goods specifically?
Tell us the product and the route — we'll tell you exactly what you need.